![]() |
|
Volume 3, Issue III |
March 2006 |
![]() |
![]() |
| area well grates installed | car port - safety light to proceed installed inside and outside |
|---|---|
![]() |
![]() |
| temporary barrier built around the wall to be demolished in ID | view of the barrier from the Control Booth side |
![]() |
![]() |
| doorway that was the main entrance into ID | north view of old ID room |
![]() |
![]() |
| beams support the opening for the connecting corridor into ID | closer view - supporting beam for the wall that was removed in ID |
![]() |
![]() |
| building the walls where the connecting corridor goes through ID | workers demolishing the walls in the old ID room for the new hallway |
![]() |
![]() |
| connecting corridor glass installed | connecting corridor finished - new building end |