Volume 3, Issue I |
January 2006 |
![]() |
![]() |
| Jan 3 - brick face on SW corner completed | Jan 3 - brick face on SE corner halfway constructed |
|---|---|
![]() |
![]() |
| insulation placed in windows to keep the building warm for interior work | curbing is done around the vehicle sally port exit |
![]() |
![]() |
| Jan 5 - last steel beam for the mechanical room roof | pre-cast roof panels being placed on the mechanical room |
![]() |
![]() |
| Jan 6 - one of the last pre-cast panels for the mechanical room roof | jan 6 - last pre-cast panel for the mechanical room roof |
![]() |
![]() |
| Jan 5 - cell cap space before equipment and ductwork | jan 13 - cell cap space after equipment and ductwork |
![]() |
![]() |
| Jan 13 ductwork, plumbing, sprinkler lines and electrical in the cell caps | Jail lobby ceiling grid |